We will be completing around the clock rail grinding, resurfacing and welding work on the north coast line at various locations between Telarah NSW and Acacia Ridge QLD commencing 6:00pm Friday 16 September and continuing through until 1:00am Monday 26 September 2022. This work will be completed in periods when fewer trains operate allowing the […]
ARTC continually operates track machines across the network to improve track conditions and allow safer, more reliable, and quieter rail operations. A rail grinding machine will be operating along the Ulan line, from Muswellbrook to Bylong from 6:00pm Sunday 25 September through until 6:00pm Tuesday 27 September 2022. This work will be completed in periods […]
Track machine maintenance – Ulan Line NSW ARTC continually operates track machines across the network to improve track conditions and allow safer, more reliable, and quieter rail operations. With track maintenance occurring in the area, track machines will be stabled for maintenance at Muswellbrook, Sandy Hollow, Kerrabee and Bylong from 6:00am to 6:00pm, Saturday 8 […]
Track machine maintenance – Ulan Line NSW ARTC continually operates track machines across the network to improve track conditions and allow safer, more reliable, and quieter rail operations. With track maintenance occurring in the area, track machines will be stabled for maintenance at Muswellbrook, Sandy Hollow and Kerrabee from 6:00am to 6:00pm, Saturday 15 October […]
ARTC will be carrying out essential track maintenance and improvement works this October at various locations between Telarah NSW and Acacia Ridge QLD. Works will commence from 6:00am Saturday October 29 and continue through until 6:00pm Sunday 30 October with nightworks in some locations. We will begin mobilising to site and carrying out minor preparation […]