Hunter Valley maintenance shutdown

Hunter Valley coal network NSW, Australia

The maintenance work is taking place over more than 62 hours from 6am Tuesday 23 August through to the late evening of Thursday the 25th of August. The pre-planned maintenance work will see everything from new rail be laid, to level crossing improvements, ballast cleaned and signalling work completed. It will take place in the […]

Wagga Wagga Rerailing

Adelaide Metro Adelaide, SA, Australia

Rerailing will occur between Sturt Highway and Tarcutta Street bridges in Wagga Wagga, from Monday 29 August to Wednesday 7 September. 1320m of rerailing will be performed, in addition to the replacement of 40 bridge timbers. Road closures will be in place: Single lane closure between Monday 29 August - Friday 2 September between the […]

Main South Shut Down

Main South Corridor Bundanoon, NSW, Australia

Planned rail maintenance works will occur from the Southern Highlands through the Riverina to Albury, as part of ARTC's 'super possession.' These essential works will commence 2 September through to 6 September, between the hours of 6am to 6pm. Overall, there are 54 projects planned including rerailing, bridge upgrades, removal of redundant infrastructure and level crossing upgrades. […]

Southern Sydney Freight Line Work

SSFL Sydney, NSW, Australia

In conjunction with ARTC's Main South Shutdown, maintenance work will be occurring on the Southern Sydney Freight line (SSFL), between Berrima in the Southern Highlands and Enfield West in the Sydney area. Works will occur from 10:30pm Friday 2 September until 2:00am Monday 5 September, and will be continuous. A range of work will take place […]

Wingello maintenance works

Main South Corridor Wingello, NSW, Australia

Works will occur between 3 and 6 September, between the hours of 6am to 6pm. It will occur approximately 250m up from the Wingello Railway Station towards Penrose. The work involves the important upgrade of rail infrastructure and will involve heavy machinery, excavators and truck movements, as well as welding and grinding activities Railway detonators […]

Maintenance Work in Metro Sydney

SSFL Sydney, NSW, Australia

Works will be occurring in Metro Sydney from 17 - 19 September. Locations as follows: Enfield North: 2am Saturday 17 September until 2am Monday 19 September. Flemington South to Enfield North: From 2am Saturday 17 September until 8am Saturday 17 September; and 2:30pm Saturday 17 September until 8am Sunday 18 September; and 2:30pm Sunday 18 […]

Port Augusta Highway Detour – Horrocks Pass Road

East West Corridor, KFC Port Augusta, SA, Australia

The railway level crossing on Horrocks Pass Road (near the Port Augusta Highway) will be closed from 2pm, 26 September to 6pm, 28 September for essential rail maintenance work. We are upgrading the level crossing and undertaking a full track reconstruction, which requires excavation down to the track’s foundation and then rebuilding with new fill, capping and ballast. New […]

Hunter Valley maintenance shutdown

Hunter Valley coal network NSW, Australia

Major network maintenance shutdown will occur from 6am, 11 October to 6am, 14 October The works will take place within the rail corridor from Kooragang Island, North to Narrabri, and between Muswellbrook and Ulan on the Ulan line The scheduled activity will include full track reconstruction, new rail, level crossing improvements, ballast cleaning, rail corridor tidy-up work […]

Rerailing – Bundanoon

Main South Corridor Bundanoon, NSW, Australia

ARTC will be conducting major track maintenance in the Bundanoon area from 6am, Saturday 5 November until 6pm, Thursday 10 November The work will not be in a fixed location as we will move along the line, and the track will be upgraded in a number of different sections This work forms part of our […]

Track undercutting – NE Victoria

Main South Corridor Bundanoon, NSW, Australia

We will be delivering essential rail maintenance work through North East Victoria in November. This work includes track undercutting which involves machinery such as excavators and dump trucks, as well as the movement and dumping of ballast at different locations alongside the track associated with this work. The work will be taking place in two […]