Track undercutting – Bargo

Bargo, NSW, Australia

ARTC will be undertaking essential maintenance work to ensure the safety and reliability of the rail track in the Bargo area. We’re aiming to get this done quickly and safely but unfortunately there may be some disruptions and some of the work is noisy and dusty which we will aim to minimise this as much […]

Track undercutting – Menangle RWS

Menangle Railway Station NSW, Australia

ARTC will be undertaking essential maintenance work to ensure the safety and reliability of the rail track at Menangle Railway Station. We’re aiming to get this done quickly and safely but unfortunately there may be some disruptions and it is noisy and dusty work - which we will aim to minimise this as much as possible. […]

Track undercutting – Tallong area

Tallong NSW, Australia

ARTC will be undertaking essential maintenance work to ensure the safety and reliability of the rail track in the area around Tallong, NSW. We’re aiming to get this done quickly and safely but unfortunately there may be some disruptions and it is noisy and dusty work - which we will aim to minimise this as much […]

Hunter Valley Maintenance Works

Hunter Valley coal network NSW, Australia

Maintenance works scheduled for 21 - 25 November. Trackwork from 6am Monday 21 November – 8pm Friday 25 November A number of road closures (see below) From Monday 21 November to Friday 25 November ARTC will deliver more than $20 million worth of maintenance work, renewing and upgrading track, ballast, sleepers and structures like bridges, […]

Track undercutting – NE Victoria

We will be delivering essential rail maintenance work through North East Victoria in November. This work includes track undercutting which involves machinery such as excavators and dump trucks, as well as the movement and dumping of ballast at different locations alongside the track associated with this work. The work will be taking place in two […]

Tamping Work – Adelaide

Adelaide Metro Adelaide, SA, Australia

Tamping work will occur in the rail corridor in the Devon Park, Parafield and Salisbury areas Works will occur from 8pm on Tuesday 29 November, and will conclude at 6am on 30 November The work will improve track geometry on the rail line The work will involve the usage of track machines and equipment movement […]

Track and Level Crossing Upgrades – Moss Vale

Moss Vale , NSW, Australia

nb. this event has been updated and  start times/ dates of work amended We are doing essential maintenance & upgrade work to the railway level crossing on Suttor Rd, Moss Vale. The level crossing will be closed to all vehicular and pedestrian access between the dates mentioned and there will be road closure and detour in […]

Moss Vale works – Track Renewal

Moss Vale yard 100-101 Lackey Road, Moss Vale, Moss Vale, NSW, Australia

The Australian Rail Track Corporation will be doing some essential rail maintenance and renewal works near you in the Moss Vale railway yard. The work involves the use of heavy plant and machinery and could be disruptive and noisy. We aim to get this done quickly and safely, however unfortunately it will generate some noise […]

Cootamundra Station Pedestrian Walkway closure

Cootamundra, NSW, 2590 Cootamundra Railway Station, 59 Hovell Street, Cootamundra, NSW, Australia

Due to planned maintenance works, the overhead pedestrian walkway between Cootamundra Railway Station and Victoria Parade will be closed between 23 – 31 January. Please use alternative route via Gundagai Road level crossing where pedestrian access is available. Thank you for your patience during these works and we apologise for any inconvenience while this essential […]

Hunter Valley major maintenance shutdown

Hunter Valley coal network NSW, Australia

Major Hunter Valley maintenance shutdown 72 hours of essential rail maintenance work from 0600 Tuesday 21 February to 0600 Friday 24 February From Kooragang / Warrabrook through to Ulan & north up to Narrabri There are a number of road closures taking place during this maintenance shutdown. Please find details below: 10 – 15 minute […]

Go to top