Tamping Work – Adelaide

Adelaide Metro Adelaide, SA, Australia

Tamping work will occur in the rail corridor in the Devon Park, Parafield and Salisbury areas Works will occur from 8pm on Tuesday 29 November, and will conclude at 6am on 30 November The work will improve track geometry on the rail line The work will involve the usage of track machines and equipment movement […]

Track and Level Crossing Upgrades – Moss Vale

Moss Vale , NSW, Australia

nb. this event has been updated and  start times/ dates of work amended We are doing essential maintenance & upgrade work to the railway level crossing on Suttor Rd, Moss Vale. The level crossing will be closed to all vehicular and pedestrian access between the dates mentioned and there will be road closure and detour in […]

Moss Vale works – Track Renewal

Moss Vale yard 100-101 Lackey Road, Moss Vale, Moss Vale, NSW, Australia

The Australian Rail Track Corporation will be doing some essential rail maintenance and renewal works near you in the Moss Vale railway yard. The work involves the use of heavy plant and machinery and could be disruptive and noisy. We aim to get this done quickly and safely, however unfortunately it will generate some noise […]

Cootamundra Station Pedestrian Walkway closure

Cootamundra, NSW, 2590 Cootamundra Railway Station, 59 Hovell Street, Cootamundra, NSW, Australia

Due to planned maintenance works, the overhead pedestrian walkway between Cootamundra Railway Station and Victoria Parade will be closed between 23 – 31 January. Please use alternative route via Gundagai Road level crossing where pedestrian access is available. Thank you for your patience during these works and we apologise for any inconvenience while this essential […]

Hunter Valley major maintenance shutdown

Hunter Valley coal network NSW, Australia

Major Hunter Valley maintenance shutdown 72 hours of essential rail maintenance work from 0600 Tuesday 21 February to 0600 Friday 24 February From Kooragang / Warrabrook through to Ulan & north up to Narrabri There are a number of road closures taking place during this maintenance shutdown. Please find details below: 10 – 15 minute […]

Oxley Hwy, Wauchope Level Crossing upgrade

Wauchope, NSW Oxley Highway, Wauchope , NSW, Australia

The Oxley Highway, Wauchope level crossing will be reconstructed. The work will involve truck movements, excavators and other equipment. Though works will be primarily during the day there will be some activity earlier in the mornings and evenings. All care will be taken to limit any noise and disturbance to the public. The Oxley Highway will be closed so please […]

Hunter Valley – Port maintenance works

Hunter Valley coal network NSW, Australia

46 hours of essential rail maintenance work from 3am, Saturday 11 March through to 1am, Monday 13 March. This shutdown period involves Port maintenance works along ARTC's Hunter Valley rail corridor focused on the coal rail lines from Islington to Telarah and Sandgate to Port Waratah.    

Maintenance shutdown – North East Victoria

North East Victoria Wodonga, Victoria, Australia

ARTC has a large program of essential maintenance work  planned for North East Victoria between Mar 11th to 13th. Works are taking place from Albury right through North East Victoria into Metropolitan Melbourne (Footscray) Works include:  Bridge Works / Turnout Replacements / essential track maintenance work / ballast cleaning and other standard maintenance tasks.

Major Hunter Valley maintenance shutdown

Hunter Valley coal network NSW, Australia

ARTC will be undertaking a 62 hour period of essential rail maintenance work from 6am Tuesday 4 April through to 8pm Thursday 6 April. Works will take place right across the rail corridor from Kooragang / Warrabrook, along the Ulan line to Ulan & north to Narrabri. Road Closures ARTC will be carrying out important maintenance works at […]

Hunter Valley maintenance shutdown

Hunter Valley coal network NSW, Australia

The Hunter Valley network will undergo major maintenance works which will force a staged shutdown of the network. Work will take place within the rail corridor: From Islington to Telarah and from Port Waratah and Kooragang to Maitland (7pm, June 9 - 3am, June 13). From Maitland to Muswellbrook (10am, June 10 - 8pm, June 12). From Muswellbrook […]

Go to top