Loading Events

« All Events

  • This event has passed.

Rail Maintenance Works – Goodwood, South Australia

January 27 @ 9:00 am - January 28 @ 10:00 pm

We will be carrying out essential track maintenance and improvement works this January at Goodwood, South Australia.  Works will commence 0:900am Saturday 27 January and continue through to 10:00pm Sunday 28 January 2024, this will include nightworks.

We will begin mobilising to site and carrying out minor preparation work during normal working hours in the days and weeks prior to the shutdown work commencing. Site clean-up will commence in the days following the shutdown and will also be completed during normal working hours.

How could this work affect you?

There may be some traffic impacts, it will be noisy at times, light towers will be used for any night works, and some dust may be generated. Please be assured that we will implement measures to manage and minimise these impacts on the community where possible.

Temporary signage will safely guide all road users around any changed traffic conditions. Please keep to the speed limits and follow the direction of the traffic controllers and signs where appropriate.

We will turn off machinery when not in use, arrange work in stages and/or phase the equipment used at one time to reduce noise impacts where possible.

The movement of materials and machinery on site may result in the generation of dust. We will take practical measures to reduce the amount of dust produced by our works where possible.

Light towers will be required to ensure a safe work environment during the night. We will position the light towers so that light is directed away from residences.

For more information please contact ARTC’s Enviroline on 1300 550 402 or enviroline@artc.com.au

Details

Start:
January 27 @ 9:00 am
End:
January 28 @ 10:00 pm

Go to top