Loading Events

« All Events

Rail Maintenance Work- Hastings River Bridge, Wauchope

August 3 @ 6:00 am - August 10 @ 6:00 am

We will be carrying out essential track maintenance and improvement works this August at the bridge over Hastings River, Wauchope.

Works will commence daily from 6:00AM to 6:00PM, from Saturday 3rd August 2024 to Monday 5th August 2024.

Night works will take place daily from 6:00PM to 6:00AM, from Tuesday 6th August 2024 to Saturday 10th August 2024.

 

How could this work affect you?

It will be noisy at times, and some dust may be generated. Please be assured that we will implement measures to manage and minimise these impacts on the community where possible.

We will turn off machinery when not in use, arrange work in stages and/or phase the equipment used at one time to reduce noise impacts where possible.

If you are affected by these works and would like to discuss further, please contact the ARTC Community Line at community@artc.com.au or 1300 550 402.

Details

Start:
August 3 @ 6:00 am
End:
August 10 @ 6:00 am

Go to top